S-34.1, r. 2 - Regulation respecting petroleum exploration, production and storage on land

Full text
62. The authorization holder must, within 12 months after the Minister granted the authorization, start the geochemical surveying work.
The work is deemed to have started as soon as the first step provided in the work schedule is initiated.
The Minister may grant an additional period if the holder demonstrates the need therefor.
O.C. 1252-2018, s. 62.
In force: 2018-09-20
62. The authorization holder must, within 12 months after the Minister granted the authorization, start the geochemical surveying work.
The work is deemed to have started as soon as the first step provided in the work schedule is initiated.
The Minister may grant an additional period if the holder demonstrates the need therefor.
O.C. 1252-2018, s. 62.